This installation, pioneer in the management of rail traffic for up to three different networks: high speed, conventional network and metric width network (RAM), will have a great videowall awarded by contract to this AV specialist.

blankThe public company Adif (Railway Infrastructure Manager) has awarded the supply contract, installation and maintenance of the video wall for the new Circulation Regulation Centre (crc) Multi-Network, which will be located in the so-called CRC building in León, to Ingevideo, Spanish engineering company, supply and installation of large-format audiovisual systems, amount of 434.000 euros and for a period of eight years.

The new CRC, that will enter service predictably before the end of this year, is a pioneering facility in the management of rail traffic for up to three different networks: high speed, conventional network and metric width network (RAM).

From this new facility will be managed 298 km. additional rail network from Leon, one 33% more than so far. An advanced control room has been designed to do this, of 371,43 m2 of diaphanous surface and double height, where a crisis room is located (of 49,80 m2), as well as offices and technical rooms.

The room has modern operational jobs, control and remote control systems, whose main system for the management of the videowall awarded to Ingevideo, which will be 24.7×1,74 metre, independent controllers to display different real-time video and power remote control sources from the network; wiring between controllers and videowall backprojectors, among other elements.


You liked this article?

Subscribe to our RSS feed And you won't miss anything.

Other articles on , ,
by • 20 sea, 2020
• section: Case studies, control, display, Signal distribution, Infrastructure